Construction Method

Home > Products > Construction Method

打擊式施工法
Pile Driver Construction

Construction Procedures:
  1. Utilize the crane to hoist the pile to the fixed position and stand vertically.
  2. The pile driver raises a hammer, put the pile in with a cap , begin to pile after aiming at a center of pile.

 

低公害外掘法施工步驟
Digging Construction Steps with Low Public Hazards

Construction Procedures:
  1. Inject spiral drill pipe into digging liquid bore
  2. Discharge part of soil and drill to the design depth
  3. Infill fixing liquid and mix it, at the same time pull out locking bar
  4. Put pile into the drill bore by gravity or turning pressurization
  5. Make curing and infill fixing liquid

 

 

低公害中掘法施工順序
Middle Digging Construction Procedures with Low Public Hazards

TOP ]